Fabrication

Prefab Advantage

Select Prefab’s panelized cold-formed steel exterior wall systems—with windows installed off-site—allow enclosure work to run in parallel with structure, compressing the critical path and accelerating overall project schedules.

Process

Quality Control & Inspection

Every Select Prefab panel is inspected using a documented Quality Control Checklist at each stage of fabrication. Materials are verified for member size, type, thickness, and connection methods as fabrication progresses, with dimensional checks for length, height, and squareness completed before panels are released.

Special conditions such as stud spacing and HSS connections are reviewed and recorded, ensuring accuracy and consistency throughout the build process. By quality-checking every fabrication step, Select Prefab delivers panels that meet design requirements and arrive on site ready for efficient, crane-installed assembly.

Engineering

Panel Layout & Delivery Coordination Plan

This drawing illustrates a coordinated prefabricated panel layout and delivery sequence. Color-coded wall segments correspond to individual prefabricated panels, while truck diagrams identify how panels are palletized and staged on Select Prefab’s vertical-delivery trailer system. Each load is planned to align with the installation sequence, allowing panels to be craned directly from the trailer into their final position. This level of planning minimizes site handling, reduces congestion, and supports efficient, just-in-time installation.

Facility Tours

We maintain several completed mock-ups showcasing a range of exterior finishes in our fabrication shop and are always happy to host facility tours for owners, architects, and project teams.

Process

BIM Coordination

Select Prefab utilizes BIM coordination to align panel design, fabrication, and installation sequencing before work begins in the field. This process allows conflicts to be identified early, improves accuracy across trades, and ensures prefabricated panels install efficiently with minimal adjustments on site.

See Pre-Construction Projects

Centennial Airport

Lone Tree 3rd Floor Clinic (Kaiser Permanente)

What Others Say About Select