Select Prefab provided cold-formed steel (CFS) exterior framing for the Colorado Convention Center expansion, supporting one of Denver’s most prominent civic and event facilities. The project required a high level of coordination, precision, and schedule reliability due to its scale and central downtown location.
All exterior framing components were prefabricated off-site to ensure dimensional accuracy, consistent quality, and efficient installation. By utilizing prefabrication, Select Prefab helped streamline the construction process, reduce on-site labor demands, and maintain tight tolerances across the building envelope
General Contractor
Hensel Phelps
501 Lincoln St.
Denver, CO 80203
Client
City and County of Denver
Architect
TVS
1200 Peachtree St., Suite 200
Atlanta, GA 30309
Every Select Prefab panel is inspected using a documented Quality Control Checklist.
Reduce jobsite crew while accelerating enclosure schedule.
Transport prefabricated panels safely and efficiently to project jobsites.
We recognize that successful construction hinges on strategic partnerships.
Select offers Design-Build services as a comprehensive construction solution.